| |
Products |
Johns Refrigeration provides the best equipment available. We have a wide selection of products and state-of-the-art equipment to serve your needs.
FINANCING IS AVAILABLE O.A.C.
WE HAVE SEVERAL DIFFERENT OPTIONS!
CLICK HERE FOR MORE INFORMATION
Make a sound decision today, not an unqualified Panic decision tomorrow. Don't wait.
We are proud to introduce the latest accessories that will make your home more comfortable, improve your health, and save you money. Please ask your technician for details on any of the following products. |
| |
|
| Peak Performance Maintenance Agreement |
|
- More reliable equipment
- More efficient operation
|
- Longer system life
- Improved quality of life
|
|
| |
| Digital Programmable Thermostat: |
|
- Better temperature control
- Saves you money
|
- Peace of min-"set it and forget it"
- Recommended by the Power Company
|
|
| |
|
- 80% more efficient than standard
1" throw away filters
|
- Increased air flow
- Lifetime warranty
|
|
| |
|
- Prevents common problems associated
with clogged drain lines ex. Ceiling damage,
mold and bacterial growth in drain pan.
|
- Reduces maintenance costs
|
|
| |
|
- Improves air quality in your home
- Removes odor, bacteria, mold, viruses, etc.
|
|
|
| |
| Whole House Air Cleaners: |
|
- Reduces allergies
- Reduces dust
|
- Proven to capture viruses & bacteria
|
|
| |
|
- Eliminates hot and cold spots in house
- Decreases utility bills
|
|
|
| |
PROBLEMS ARE NOT SOLVED BY EQUIPMENT ALONE |
|
| |
|
- Install balancing dampeners
- Set/check cooling air volume
- Set/check heating air volume
- Install double deflection defusers (optional)
- Install new return air grills (optional)
|
|
| |
|
- Vibration eliminators
- Canvas duct connectors as required
- Set/check cooling air volume
- Insulated air return(s)
- Cross-break sheet metal
- Insulate all new ductwork
|
|
| |
|
- Install new condensate drain
system as required
- Refrigerant removal per federal guidelines
- Provide completion certificate
|
|
| |
|
- Correct grilles and registers as required
- Correct duct size
- Duct sealing and insulation
- Final air balance
|
|
| |
|
| |
|
- Use 15% silver brazing rod
- Evacuate system
- Complete system leak check
before start-up
- Charge to manufacture's
recommendations
- Insulate suction line
- Perform certified start-up
|
|
| |
| SAFETY FIRST ELECTRICAL PACKAGE |
|
- Double insulate copper wire
- Sunlight resistant wire ties
- New low voltage wiring as needed
|
|
| |
|
- Caulk with lifetime duct sealant
- Easy-change filter grill(s) (optional)
|
|
| |
|
- Training and procedures
- Special test equipment
- Top of the line materials
- Inspection
|
|
| |
|
|
|
| |
|